Skip to content

Procedure for Incentive Component

TRANSMISSION SYSTEM OPERATOR

In determining the procedure, the following elements were taken into consideration:

• The state of the electricity system.
• The volumes of balancing energy provided in the domestic balancing market as well as through interconnection.
• Historical analysis of the financial balance of the balancing market.

Private guided trips Albania 2026 rent a car tirana real estate saranda taxi reykjavik day tours from tirana